Zambezi River Authority gears up for community consultations on proposed 2 400 MW Batoka Gorge hydro scheme

The Zambezi River Authority (ZRA) is preparing to conduct disclosure meetings with communities in Zambia and Zimbabwe whose land or livelihoods could be affected by the construction of the proposed 2 400 MW Batoka Gorge Hydro Electric Scheme (BGHES), a transboundary project located 47 km downstream of the Victoria Falls. https://www.engineeringnews.co.za/article/zambezi-river-authority-gears-up-for-community-consultations-on-proposed-2-400-mw-batoka-gorge-hydro-scheme-2020-09-01

    Leave a Reply

    Your email address will not be published. Required fields are marked *